Wednesday, September 3, 2014

GeoTraffic Roadwork Roundup - Washington, DC!


GeoTraffic Roadwork Roundup - Washington, DC!
September 1st - September 7th


Off-peak single-lane closures on westbound Canal Road, NW, between Foxhall Road and Chain Bridge Road, on Tuesday, September 2 to Thursday, September 4; from 10 AM to 3 PM.

Off-peak single-lane closures on Oregon Avenue NW, near Beech Street from Tuesday, September 2 to Wednesday, September 10, 2014, from 9 AM to 3:30 PM.

As part of the 11th Street Bridge Project, the District Department of Transportation will extend the closure of L Street SE, between 10th Street and 11th Street. The closure, which began at the end of July 2014, is needed for crews to complete sidewalk and drainage reconstruction work. L Street SE, between 10th Street and 11th Street, is now scheduled to reopen by Tuesday, September 30, 2014

In Prince George's County double lane closures in both directions Sundays through Thursdays for resurfacing from 9 PM to 5 AM on MD-4/Pennsylvania Ave from Ritchie Marlboro Road to Dower House Road.

GeoTraffic Roadwork Roundup - San Diego!


GeoTraffic Roadwork Roundup - San Diego! 
September 1st - September 7th


Sign work on CA-79 northbound and southbound from the Riverside County line to Warner Springs weekdays 7 AM to 6 PM

Utility work on the 94 westbound from Maxfield Road to Vista Diego Road 9 AM to 3 PM.

Roadwork on westbound Palomar Street at the 805 weekdays through November.

GeoTraffic Roadwork Roundup - San Francisco!


GeoTraffic Roadwork Roundup - San Francisco!
September 1st - September 7th


On Wednesday, September 3rd at 12 AM, Caltrans will close the southbound I-880 ramp for paving and a minor realignment of the traffic lanes. The northbound ramps from I-280 and I-880 will be closed to allow debris removal from the roadway. Caltrans estimated time to reopen the roadway will be at 5:00am.

Starting in August, every Tuesday and Thursday between 1:00am and 3:00am until October 2014, Caltrans will install a series of eleven 25-foot-high overhead sign frames that will span the width of the westbound I-80 lanes between Cutting Blvd in Richmond and Powell Street in Emeryville. Full lane and freeway closures of westbound I-80 in the vicinity of the installations will be required, weather permitting. Detours will be available via frontage roads. Full freeway and lane closures are also planned for Tuesdays and Thursdays between9:00pm and 5:00am.

Caltrans construction has closed CA-1 in both directions and detoured traffic onto San Pedro Avenue, south of Linda Mar Blvd, in Pacifica as part of the San Pedro Creek Bridge Replacement Project.

GeoTraffic Roadwork Roundup - Philadelphia!


GeoTraffic Roadwork Roundup - Philadelphia!
September 1st - September 7th


Ramp from I-676 eastbound to I-95 southbound closed Wednesday September 3rd 8 PM to 5 AM for repair work.

Crack sealing on Academy Road overnights with lane restrictions between I-95 & Knights Road all week from 7 PM to 5 AM.

I-76 eastbound and westbound drain cleaning and debris removal with lane restrictions between RT-1/City Ave and 26th Street weekdays 9:30 AM to 2 PM.

I-95 northbound and southbound drain cleaning and debris removal with lane restrictions between the Airport and Woodhaven weekdays 9:30 AM to 2 PM.

Paving operations on I-95 northbound and southbound between Bartram Ave and Girard Point Bridge overnights all week from 9 PM to 5 AM.

Construction on the Ben Franklin Bridge has begun and will continue until October. From 5:00 AM to 9:30 AM, 3 lanes are open to Philadelphia. During all other times, only 2 lanes to Philadelphia will be opened. Motorists are advised to use alternate crossings to and from Philadelphia.

GeoTraffic Roadwork Roundup - New York City!


September 1st - September 7th


Overnight detours for Manhattan-bound traffic on the Brooklyn Bridge Monday - Thursday nights: 11 PM to 6 AM.
In the Bronx expect lane closures on I-95 the Cross Bronx Expressway between Amsterdam Ave and Webster Ave from 11 PM to 5:30 AM weeknights, 12 AM to 5:30 AM Saturdayand 12 AM to 5:30 AM Sunday
Lane closures northbound and southbound on I-87/The Deegan Expressway Monday through Saturday 10 AM to 3 PM daily and 10 PM to 5 AM nightly.

In Brooklyn one of three lanes will be closed on the outbound/southbound Gowanus Expressway from the Belt Parkway to 3rd Ave.
In Queens one lane of Grand Central Parkway will be closed eastbound and westbound between 82nd Street and 111th Street from 10 AM to 2 PM and again from 10 PM to 5 AM weekdays and again 10 PM Friday through 7 AM Saturday for landscaping.

Look for single lane closures on the Staten Island Expressway eastbound and westbound between 9 AM and 3 PM weekdays and again 10 PM to 5 AM weeknights for road repair.

Overnight construction on the George Washington Bridge upper level inbound Tuesday through Thursday 9 AM to 5 AM again Friday 10 PM though 10 AM Satuday with only one lane open on the upper level inbound.

In New Jersey...

The I-80 express ramp to the New Jersey Turnpike southbound closed for bridge work. All Traffic to the Turnpike Southbound roadway must use I-80 Local. This new traffic pattern will remain in effect until this November.

GeoTraffic Roadwork Roundup - Los Angeles!


GeoTraffic Roadwork Roundup - Los Angeles!
September 1st - September 7th


Demolition work on the 210 eastbound from the 210 to westbound Sunland Boulevard through the end of the month.

Pavement work on the 210 eastbound from the 210 to eastbound Sunland Boulevard through the end of the month.

Roadwork on the 39 southbound and northbound at the 10 with pavement work through October.

Longterm bridge construction on the 47 northbound and southbound from Ocean Boulevard to Henry Ford Boulevard.

GeoTraffic Roadwork Roundup - Detroit!


GeoTraffic Roadwork Roundup - Detroit!
September 1st - September 7th

Demolition is scheduled to start next week on the I-75 bridge at Woodward north of downtown Detroit. Southbound traffic will be shifted Tuesday to Woodward’s northbound lanes over I-75. Northbound traffic, southbound traffic and the center turn lane will be on the east side of Woodward.

I-75 in Wayne County, overnight road repair northbound and southbound between Sibley Road and Goddard Road with lane restrictions.
Road resurfacing on West Jefferson Ave in the city between Griswold Street and St. Antoine Street with one lane opened in each direction.
Roadwork on Woodward Ave between Chandler Street and Adams Street with lane closures in each direction including the center left-turn lane.
Long term closure on I-96 eastbound and westbound continues between Telegraph Road and Newburgh Road with detours in effect through November.
Guardrail installation on I-94 eastbound and westbound between Hannan Road and I-275 including shoulder closures during off-peak times.

GeoTraffic Roadwork Roundup - Boston!


GeoTraffic Roadwork Roundup - Boston!
September 1st - September 7th


Overnight closure of the ramps from The Expressway southbound at exit 24 to Government Center and the Callahan Tunnel on Wednesday, September 3rd through Thursday, September 4th from 11 PM to 5 AM.

Late night closure of the ramp from Somerville, at Stop and Shop, to the Expressway southbound on Tuesday, September 2nd through Friday, September 5th from 9 PM to 5 AM.

Closure of the ramp from Northbound Frontage Rd and Broadway Bridge to the Expressway on Wednesday, September 3rd from 11:30 PM to 5 AM.

Overnight closure of the Mass Pike at exit 22 with all traffic detoured off road at the exit on Wednesday, September 3rd through Thursday, September 4th from 11 PM to 5 AM.

Left lane closure on the Mass Pike westbound in the Prudential Tunnel on Wednesday, September 3rd from 9:30 AM to 2 PM.

GeoTraffic Roadwork Roundup - Atlanta!


GeoTraffic Roadwork Roundup - Atlanta!
Sept 1st - Sept 7th


Construction on I-20 at mile post 96 in Newton County taking out the right lane through Friday morning at 5 AM

Work crews have begun work on reconstruction of the Spring Street Viaduct in downtown Atlanta. All traffic on Spring will be detoured to avoid the construction area. This detour will be in place through Fall 2015. 

Tuesday, August 26, 2014

GeoTraffic Roadwork Roundup - Washington DC!


August 25th - August 31st

In Prince George's County double lane closures in both directions Sundays through Thursdays for resurfacing from 9 PM to 5 AM on MD-4/Pennsylvania Ave from Ritchie Marlboro Road to Dower House Road. 

Repairs on I-66 eastbound and westbound at exit 52 in Centreville over RT-29.

Shoulder work continues on I-495 northbound where the the express lanes merge with the local lanes...
Daytime:
Mondays through Thursdays: From 10 a.m. to 3 p.m.
Fridays: From 10:00 a.m. to noon
Nighttime Lane Closures:
Mondays through Thursdays: From 9 p.m. to 5 a.m.
Fridays: From 10 p.m. to 9 a.m. on Saturday mornings
Saturdays: From 9:30 p.m. to 9 a.m. on Sunday mornings
Sundays: From 8:30 p.m. to 5 a.m. on Monday mornings

GeoTraffic Roadwork Roundup - San Diego!


August 25th - August 31st

Long term roadwork on CA-78 eastbound and westbound at Wynola Road for tree work starting Monday, the 25th at 8 AM.

Roadwork on Sorrento Valley Road between Carrol Canyon Road and Vista Sorrento Parkway.

Roadwork on Cannon Road in Carlsbad between I-5 and Car Country Dr. 

GeoTraffic Roadwork Roundup - San Francisco!


August 25th - August 31st


Thursday night preseason football for the 49ers5 PM game time against the Houston Texans.
Motorists should expect very heavy traffic and delays before and after the game on US-101 and CA-237, as well as local streets adjacent to the stadium.

Caltrans will close Northbound I-280 in San Francisco, between the US-101/I-280 Interchange and Downtown SF, over the Labor Day Weekend. The roadway will officially close at2:00 pm on Thursday, August 28th to continue the bridge hinge replacement project, and will remain closed until 5:00 am on Tuesday, September 2nd. For more information and detour routes please

Starting in August, every Tuesday and Thursday between 1:00am and 3:00am until October 2014, Caltrans will install a series of eleven 25-foot-high overhead sign frames that will span the width of the westbound I-80 lanes between Cutting Blvd in Richmond and Powell Street in Emeryville. Full lane and freeway closures of westbound I-80 in the vicinity of the installations will be required, weather permitting. Detours will be available via frontage roads. Full freeway and lane closures are also planned for Tuesdays and Thursdays between 9:00pm and 5:00am. This project is expected to be completed with fully functional overhead signage as early as 2015

Caltrans construction has closed CA-1 in both directions and detoured traffic onto San Pedro Avenue, south of Linda Mar Blvd, in Pacifica as part of the San Pedro Creek Bridge Replacement Project. Southbound traffic will continue on CA-1 by making a right turn onto San Pedro Ave, and northbound traffic, coming from the Devil's Slide Tunnels, will continue onto San Pedro Ave making a left turn at Linda Mar Blvd to get back to CA-1. This project will allow work crews to construct access to the creek and is expected to be completed by October 2016, weather permitting.

GeoTraffic Roadwork Roundup - Philadelphia!


GeoTraffic Roadwork Roundup - Philadelphia!
August 25th - August 31st


Gradual street closures along the Ben Franklin Parkway start the week of the 25th and will spread outward until the weekend of the festival, Saturday, August 31st through Tuesday September 3rd .
Closure points will run from the Parkway and 20th north to 20th and Spring Garden, west across 76 to 31st Street, MLK Drive from Montgomery to the Art Museum, Kelly Drive from Fairmount to Eakins Oval, and 22nd, 23rd, 24th, and 25th Streets between Fairmount and Spring Gardent.
If you are traveling to Philadelphia for Made In America, your best bet is to use public transportation to get to the Benjamin Franklin Parkway. NJ Transit will be operating under the normal weekend schedule and SEPTA will be adding service to the Broad Street and Market-Frankford subway lines during the two-day festival. Late-night service will also be extended on select Regional Rail lines.
Rumble strip installation on Woodhaven Road between RT-1/Roosevelt Boulevard and the Bristol Pike, PA-13 weekdays from 9 AM to 3 PM.
Overnight bridge joint repair on I-95 southbound with lane closures between Kerlin Street and Highland Ave from 9 PM to 5 AM

Milling and paving operations with lane closures on I-95 northbound ans southbound between Bartram Ave and the Girard Point Bridge overnights from 9 PM to 5 AM.

Drain cleaning and debris removal on I-676 eastbound and westbound weekdays from 9:30 AM to 2 PM.


Drain cleaning and debris removal on I-76 eastbound and westbound between RT-1/City Ave and 26th Street 9:30 AM to 2 PM weekdays. 

GeoTraffic Roadwork Roundup - New York City!


August 25th - August 31st


Overnight detours for Manhattan-bound traffic on the Brooklyn Bridge Monday - Thursday nights: 11 PM to 6 AM.

In the Bronx expect lane closures on I-95 the Cross Bronx Expressway between Amsterdam Ave and Webster Ave from 11 PM to 5:30 AM weeknights, 12 AM to 5:30 AM Saturday and 12 AM to 5:30 AM Sunday 

Lane closures northbound and southbound on I-87/The Deegan Expressway Monday through Saturday 10 AM to 3 PM daily and 10 PM to 5 AM nightly. 

In Brooklyn one of three lanes will be closed on the outbound/southbound Gowanus Expressway from the Belt Parkway to 3rd Ave. 

In Queens one lane of Grand Central Parkway will be closed eastbound and westbound between 82nd Street and 111th Street from 10 AM to 2 PM and again from 10 PM to 5 AM weekdays and again 10 PM Friday through 7 AM Saturday for landscaping. 

Look for single lane closures on the Staten Island Expressway eastbound and westbound between 9 AM and 3 PM weekdays and again 10 PM to 5 AM weeknights for road repair. 

The I-80 Express Ramp to the New Jersey Turnpike Southbound roadway is closed for bridge work. All Traffic to the Turnpike Southbound roadway must use I-80 Local. This new traffic pattern will remain in effect until this November.

Nightly roadwork has begun on the Palisades Interstate Parkway and will continue until December. Please consider using Mass Transit or an Alternative Route. 

GeoTraffic Roadwork Roundup - Los Angeles!


GeoTraffic Roadwork Roundup - Los Angeles!
August 25th - August 31


Bridge work on the 605 southbound from RT-210 to Arrow Highway on Monday the 25th from 9:30 AM to 2 PM.
Overnight pavement work on CA-39 northbound and southbound at RT-10 the San Bernadino Freeway closing multiple lanes. 

Bridge work causing a complete closure of the on the ramp from southbound Branford Street to the 5 southbound.
Demolition work on the connector bridge from the 710 southbound to Ocean Boulevard southbound.
Long term bridgework on the 110 northbound at C street.

Longterm work continues on the ramp from the 710 southbound connector to Ocean Boulevard southbound.
Made in America will close streets from Aug. 23 to Sept. 4.
N. Main from Temple to 1st Street
N. Spring from Temple to 1st Street
N. Hill from Temple to 1st Street
N. Grand Avenue from Temple to 1st Street
N. Broadway from Temple to 1st Street
S. Spring from 1st to 2nd Street
1st from Main to Olive Street
Hill from 1st to 2nd Street
Broadway from 1st to 2nd Street
Main from 1st to 2nd Street
As part of advanced relocation of utilities to pave the way for the construction of station boxes and tunnels to begin on the Regional Connector Project, 2nd Street between Spring Street and Broadway will remain closed for a 4- week period beginning Saturday, August 23.

The closure is necessary so utility crews can install electrical vaults on 2nd Street to support the construction of the 2nd Street/Broadway Station for the Regional Connector. Because the vaults are the width of the street, a 4-week full closure is needed for this work. The closure will be in effect 24-hours a day.

Anticipated hours of construction work are 7 a.m. to 9 p.m. Monday – Friday, 8 a.m. to 8 p.m. on Saturdays and 9 a.m. to 9 p.m. on Sundays. Barriers will be placed to separate the work area from traffic and during the closure, saw-cutting, excavation, conduit and vault installation work will be performed.

Civic Center/Grand Park Station will be closed during Made in America. Trains will not stop at the station

GeoTraffic Roadwork Roundup - Detroit!


GeoTraffic Roadwork Roundup - Detroit!
August 25th - August 31st

I-75 in Wayne County, overnight road repair northbound and southbound between Sibley Road and Goddard Road with lane restrictions.

Road resurfacing on West Jefferson Ave in the city between Griswold Street and St. Antoine Street with one lane opened in each direction.

Roadwork on Woodward Ave between Chandler Street and Adams Street with lane closures in each direction including the center left-turn lane.

Long term closure on I-96 eastbound and westbound continues between Telegraph Road and Newburgh Road with detours in effect through November.

Guardrail installation on I-94 eastbound and westbound between Hannan Road and I-275 including shoulder closures during off-peak times. 

GeoTraffic Roadwork Roundup - Boston!


August 25th - August 31st

Overnight closure on the ramp from Leverett Circle to I-93/The Expressway southbound SB Monday through Thursday, August 28th from 11 PM to 5 AM. 

Double right lane closure from lower deck of I-93/The Expressway, through the O'Neil Tunnel, closing exits 20 B from Monday, August 25th through Wednesday, August 27th from 11 PM to 5 AM.

Double left lane closure on I-93/The Expressway northbound approaching the entry of the O'Neil Tunnel to the Zakim Bridge from Wednesday, August 27th from the hours of 11:30 PM to 5 AM. 

Left lane closure of I-90/The Mass Pike eastbound at Commonwealth Ave under Bowker Overpass on Thursday, August 28th from 7 AM to 3:30 PM.

Right lane closure in the Callahan Tunnel on Thursday, August 28th from 11 PM to 5 AM.

GeoTraffic Roadwork Roundup - Atlanta!


August 25th - August 31st

Spring Street Detour Beginning September 2, 2014. Work crews will begin work on reconstruction of the Spring Street Viaduct in downtown Atlanta. Beginning September 2, 2014, (weather permitting) all traffic on Spring will be detoured to avoid the construction area. This detour will be in place through Fall 2015.  

Rolling closures overnight from 9 PM to 5 AM overnights on the outer Perimeter at Washington Road. 
Construction on the inner Perimeter taking out two lanes from 5 AM to 8:35 AM overnight at GA-400.

Tuesday, August 19, 2014

GeoTraffic Roadwork Roundup - Philadelphia!


GeoTraffic Roadwork Roundup - Philadelphia!
August 18th - August 24th


On The Schuylkill Expressway in both directions, paving will result in lane restrictions between Passyunk and Grays Ferry, nightly this week from 9pm - 5am.  

Also on 76, drain cleaning and debris removal will take place in both directions this week. We will see lane restrictions between City Avenue and 26th Street from 9:30am - 2pm.

On Rt 1, The Roosevelt Boulevard, NB, milling and paving will shut down the inner drive between 9th St and Winchester St, each night from 7pm - 5am.

I-95 will have lane restrictions for milling and paving work between Bartram Avenue and the Girard Point Bridge, every night this week from 9pm - 5am.

On Rt 202 NB, patching will take place on the ramp to 76 EB, partially blocking the ramp all week long from 8am - 5pm.


On Rt 611 (Broad St) foundation excavation and light installation is happening this week, with lane closures between Spring Garden St and Glenwood Ave, daily from 7am - 3:30pm.

GeoTraffic Roadwork Roundup - Atlanta!


GeoTraffic Roadwork Roundup - Atlanta!
August 18th - August 24th


ATLANTA

In Fulton County, construction on Riverside Dr will block between N. Harbor Dr and Johnson Ferry Rd.

In Atlanta, Streetcar Project Expect closures along Auburn Ave. near Peachtree St. and on surrounding roads.

In Fulton County, Line Creek Bridge Replacement. Bohannon Rd is blocked between Mann Rd and Creekwood Rd until July 2015.

In Atlanta, road closed indefinitely - Martin Luther King Jr. Dr. between Northside Dr. and Centennial Olympic Park Dr. to begin new stadium construction. Mitchell and Tatnall Streets are alternates.

In Cherokee County, portions of Hickory Road, Holly Street, and Palm Street will be repaired and resurfaced. Expect delays. 

Road Closures for Filming: In Atlanta: Lane Closure Pryor St. between Alabama St. and M.L. King Jr. Dr. 7:00 a.m. to 10:00 a.m. daily through 8/26.

GeoTraffic Roadwork Roundup - Washington DC!


GeoTraffic Roadwork Roundup - Washington DC!
August 18th - August 24th


Washington, D.C.

In Baltimore City, E. 26th street is closed for emergency road construction Both EB/WB between North Charles Street and Saint Paul Street all this week from midnight to 5 am 

The right lane closed on George Washington Pkwy NB between Vernon View Dr and Waynewood Blvd from Monday to Friday 10 P.M. to 5 A.M.

Inside the District, 2nd St off-ramp closed SB after Washington Ave this week for re-construction from 10 P.M. to 5 A.M.

Long-term road construction on Benning Rd between Hwy 295 and Oklahoma Ave expect delays .

GeoTraffic Roadwork Roundup - Los Angeles!


GeoTraffic Roadwork Roundup - Los Angeles!
August 18th - August 24th


Bridge work causing a complete closure of the on the ramp from southbound Branford Street to the 5 southbound.
Demolition work on the connector bridge from the 710 southbound to Ocean Boulevard southbound.
Long term bridgework on the 110 northbound at C street.

Longterm work continues on the ramp from the 710 southbound connector to Ocean Boulevard southbound.

Road excavation on the ramp from the 5 southbound to Scott Road southbound.

GeoTraffic Roadwork Roundup - New York City!


GeoTraffic Roadwork Roundup - New York City!
August 18th - August 24th


NEW YORK CITY

Due to the Brooklyn Bridge Ramps Rehabilitation Project, several lane closures may affect motorists travelling between Manhattan and Brooklyn.
Overnight Detours for Manhattan-Bound Traffic
Monday - Thursday nights: 11 P.M. to 6 A.M.
Friday night into Saturday morning midnight to 7 A.M.
Saturday night into Sunday morning midnight to 9 A.M.

Cross Bronx Expressway (Alexander Hamilton Bridge) between Amsterdam Avenue and Webster Avenue. One lane may be closed on the Cross Bronx Expressway in each direction 11 P.M. to 5:30 A.M. weeknights, 12:01 A.M. to 5:30 A.M. Saturday.

One of three lanes of the Van Wyck in each direction may be closed 10 A.M. to 2 P.M. and 1 A.M. to 5 A.M. Monday through Friday between Jewel Avenue and Union Turnpike.

In New Jersey nightly roadwork has begun on the Palisades Interstate Parkway and will continue until December. Please consider using Mass Transit or an Alternative Route.

The I-80 Express Ramp to the New Jersey Turnpike Southbound roadway is closed for bridge work. All traffic to the Turnpike Southbound roadway must use I-80 Local. This new traffic pattern will remain in effect until this November.

GeoTraffic Roadwork Roundup - Chicago!


GeoTraffic Roadwork Roundup - Chicago!
August 18th - August 24th


CHICAGO

A traffic shift is scheduled this week to move all traffic onto the newly reconstructed portion of the bridge carrying eastbound Devon Avenue traffic over I-290.

The Church Road Bridge carrying traffic over the Reagan Memorial Tollway (I-88) in Aurora is scheduled to close the week of August 18, for reconstruction. Electronic message signs and construction signs will be put in place to alert drivers in advance of the closure and detour.  

The Illinois Department of Transportation announced that as part of the on-going Cumberland Avenue Widening Project, the ramp from eastbound I-90 to southbound Cumberland Avenue, will have a restricted width of 9'- 6"  until August 31st, 2014. 

GeoTraffic Roadwork Roundup - Boston!


GeoTraffic Roadwork Roundup - Boston!
August 18th - August 24th

BOSTON

Overnight lane closures on Storrow Drive Westbound at Longfellow Bridge from Monday the 18th through Friday, August 22nd, 9 P.M. to 5 A.M.

In Lexington I-95 overnight lane closures for bridge work on RT-2 between Exit 28 & Exit 30, overnight lane closures from Monday the 18th through Thursday, August 21st, 8 P.M. to 5 A.M.

Ramp closure from the Leverett Circle to the Expressway southbound from Monday the 18th through Wednesday, August 20th, 11 P.M. to 5 A.M.

Closure of the ramp from Storrow Drive EB to the Bowker Overpass southbound Tuesday, August 19th through Wednesday, August 20th and Friday, August 22nd from 9:30 A.M. to 3 P.M.

Left lane closure in the Ted Williams Tunnel westbound on Wednesday, August 20th through Thursday, August 21st from11:30 P.M. to 5 A.M.

GeoTraffic Roadwork Roundup - Detroit!


GeoTraffic Roadwork Roundup - Detroit!
August 18th - August 24th


DETROIT
Shoulder work on I-275 northbound and southbound from Wednesday the 20th of August through Wednesday October 1st between 5 Mile Road and I-696 weekdays 9 A.M. to 3 P.M.

Shoulder work on I-75 northbound between M-10/The Lodge and I-94 from Monday the 18th through Sunday the 24 of August daily from 7 A.M. to 6 P.M.
Overnight ramp closure from eastbound I-94 to the John R Street/Woodward Avenue exit from Wednesday now until Friday the 30th of October.

Shoulder work on M-10/The Lodge starting Monday the 18th through Friday August 29th daily from 9 A.M. to 3 P.M. between I-696 and I-96.

GeoTraffic Roadwork Roundup - San Francisco!


GeoTraffic Roadwork Roundup - San Francisco! 
August 18th - August 25th 


In Alameda on 580 EB highway construction between Airway Blvd and Livermore Ave that will affect lanes 1 through 4 from Monday 8/18 till Saturday 8/23. Monday through Friday the lanes will be closed between 8 P.M. and 6 A.M. From Friday till Saturday it will be closed between 9 P.M. and 9 A.M.

In Santa Clara on 101 SB paving/overlay between the Embarcadero and Shoreline Blvd. It will affect lane 1 from Monday 8/18 till Saturday 8/23. Monday through Friday the lane will be closed from 10 P.M. till 5 A.M. and Friday into Saturday from 10 P.M. till 8 A.M.

NB on 101 in Santa Clara we will also have paving/overlay between Shoreline Blvd and the Oregon Expwy. It will affect lane 1 from Monday 8/18 through Saturday 8/23 every night from 11 P.M. till 5 A.M.

In Santa Clara on 880 SB roadway excavation from Stevens Creek Blvd to Route 280. It will affect the 2nd and 3rd lanes as well as the auxiliary lane from Monday 8/18 till Saturday 8/23. Monday through Friday the lanes will be closed from 11 P.M. till 6 A.M. and 11 P.M. till 8 A.M. from Friday night into Saturday morning