GeoTraffic Roadwork Roundup - Atlanta!
August 4th - August 10th
On the Inner Loop of The Perimeter, Road
construction has three lanes closed Eastbound between Riverside Dr/Exit
24 and Ashford-Dunwoody Rd/Exit 29
Left lane
closed will be closed for road construction on the Outer Loop of The
Perimeter, Southbound between Paces Ferry Rd/Exit 18 and Atlanta Rd/Exit
17 from 10 pm on Monday August 4th to 5 am on Friday August 8th
Three lanes closed on The Downtown Connector
Southbound at Martin Luther King Dr/Exit 248a due to road construction
all this week between 10pm - 5 am
Paving operations on US-19/Peachtree Rd NE at 26th St will continue until Friday, August 8th at 9pm
No comments:
Post a Comment