This week's Roadwork Roundup features a full list of closures for the 37th annual San Francisco marathon, with closures beginning this Saturday at 12midnight.
- From 12midnight to 3:00pm, the northbound Embarcadero/King St. will be closed from 3rd St. to Broadway.
- From 12 midnight to 3:00pm, the southbound Embarcadero will be closed from Broadway to Harrison.
- At Fisherman's Wharf, Jefferson St. between Northpoint and Hyde will be closed from 5:30-7:30am.
- The Golden Gate Bridge Roadway lines will be affected from 1:00am-1:00pm. Two-way vehicle traffic will remain available at all times; but drivers can expect lane closures and heavy delays.
- From 4:30am to 10:00am, Lincoln Blvd. and all intersections onto Lincoln Blvd. from the 25th Ave. gate to Lendrum Ct. will be closed.
- From 4:30am to 10:00am, Mason Street and all intersections onto Mason Street will be closed from the Marina Gate to Crissy Field Avenue.
- From 4:30am to 10:00am, Crissy Field Avenue will be closed.
- In the Richmond District from 6:00am-10:00am, eastbound and westbound traffic should expect delays at 26th and 27th Avenues.
- 26th and 27th Avenues from Fulton Street to Lake Street will be closed to through traffic.
- In the Sunset and Richmond Districts, north and south access to Golden Gate Park should use Great Highway, Kezar, or the 19th Avenue/Park Presidio entrances and motorists can expect significant delays.
- In Golden Gate Park, southbound Crossover Dr., JFK Dr. from 47th Ave to Kezar, MLK Jr. Dr from Lincoln to 25th Ave, Transverse Dr., and Stow Lake Dr. will be closed from 5:00 am to approx 11:30 am.
- In Upper Haight (pronounced HATE), north and south access across Upper Haight Street should use Kezar Drive and expect significant delays.
- In Lower Haight, north and south access across Lower Haight Street should use Steiner or Fillmore and expect significant delays.
- From 6:30am to 12noon, there will be no access to Market St. between Duboce Ave. and Guerrero Street.
- In Mission and Potrero Districts, on 15th, 16th and 17th Sts. from 6:45am to 12:30pm, northbound and southbound traffic needing to cross over should use Highway 280 or Highway 101 whenever possible. Crossovers are also available at some city streets where significant delays should be expected – Valencia, South Van Ness, Folsom, Bryant, or Potrero Street.
- The Third Street Detour will be in place from 7:00am to 12:30pm. Southbound traffic should use the westbound 20th Street overpass to southbound Pennsylvania Street to eastbound 23rd Street back to Third Street. Northbound traffic should use westbound 23rd Street to northbound Pennsylvania Street to eastbound 20th Street to Third Street
- In the South Beach Area, Terry Francois Blvd will be closed from 7:00am to 12:30pm.
PHILADELPHIA
I-95 Overnight Lane Restrictions Next Week in Delaware County for Resurfacing |
On 422 Eastbound, there is ongoing construction between 724 and Sanatoga, with lane closures weekdays from 5PM til 5AM.
In East Goshen township, Rt 352 is closed and detoured due to utility installation between Wickerton Drive and Green Lane, weekdays from 9AM til 3PM, through August 14th.
In Northeast Philly, Woodhaven Rd has lane restrictions between Rt 13 and Knights Road for overhead bridge repair, weekdays from 9AM til 3PM, through August 14th.
On Rt 611 in Abington, road widening has lane blockages southbound between Hilltop Road and Harte Avenue, weekdays from 9AM til 3PM through the 31st.
In Upper Merion Twp, North Gulph Road has lane closures between Guthrie Road and Warner Road due to construction, weekdays from 9AM til 3PM and 7PM til 6AM, through August 29th.
And in Ridley township, MacDade Boulevard has lane restrictions between Edgewood avenue and Haverford Avenue, for utility installation, weekdays between 9AM and 3PM through the 31st.
BOSTON
93 SB
Closure of the ramp from Purchase/Congress to I-93SB / I-90 WB on Thursday, July 24th from the hours of 11 PM to 5 AM
Mass Pike
Left lane closure on I-90 EB prior to exits 24 A/B/C, closing exits 24B (I-93 NB) and 24C (I-93 SB) on Thursday, July 24th from the hours of 11 PM to 5 AM
Callahan Tunnel
Right lane closure from the middle of the Callahan Tunnel through the exit on Monday, July 21st and Wednesday, July 23rd from the hours of 9 PM to 5 AM
Left lane closure from the middle of the Callahan Tunnel through the exit on Tuesday, July 22nd and Friday, July 25th from the hours of 9 PM to 5 AM
Rt 1
Left lane Closed on tobin Bridge SB between Chelsea Curves and Tobin Bridge Tolls (long term.)
RT 2
EB and WB between Bedford RD and Crosbys Corner. (long term)
WASHINGTON DC
Inside the District:
Long-term road construction on US-1 /Rhode Island Ave between Vermont
Ave/13th St NW and North Capitol St
H Street EB is closed due to road construction at 18th St. Scheduled to be
closed until late 2016
Long-term road construction on the SE Fwy East between I-295 & Martin
Luther King Jr. Ave and Pennsylvania Ave (Sousa Bridge). After the 6th street
Exit SE all traffic must exit onto the OB 11th ST bridge to acces NB or SB
DC-295.
Long-term road construction on Benning Rd between I-295/Kenilworth Ave and
Oklahoma Ave
Inside the Beltway:
Road construction 2 lanes closed MD-355 N between Bradley Blvd and
MD-410/Montgomery Ave
Cedar Lane is closed in both direction between MD-355 and Elmhirst Parkway
Road construction has the right lane closed on MD-202 EB between US-50 and
Martin Luther King Jr Hwy
left lanes are closed for milling
and paving on I-395 SB between VA-27 /Washington Blvd and VA-7 /King St
Beltway:
Right lane closed on the Beltway Inner Loop between Georgia Ave and US 29
2 lanes get by in each direction on University Boulevard at The Beltway
The right lane approaching the Springfield interchange is closed for
construction on the inner loop of the beltway
Outside the Beltway:
2 right lanes closed on the Intercounty Connector E at US-29/Columbia Pike
Road construction has the right lane closed on I-95 (MD) N between MD-198
and MD-216
I-95 (VA) Express Lanes are closed between
VA-234 and The Beltway and on I395 from teh beltway to the 14th street
bridge until Jan 2015
ATLANTA:
Road Closed Indefinitely: Martin Luther King Jr. Dr. between
Northside Dr. and Centennial Olympic Park Dr. to begin new stadium
construction. Mitchell and Tatnall Streets are alternates.
Streetcar Project: Expect closures along Auburn Ave. near
Peachtree St. and on surrounding roads.
I-20 WB: inside the perimeter exit and entrance ramps between
Flat Shoals Road and the Downtown Connector will be closed intermittently for
re-paving
I-20: In Douglas County, two westbound lanes of I-20 will be closed
nightly between Ga. 5 and Liberty Road.
NYC
GWB:
3 upper-level lanes closed for deck rehab work M-Th 9p-5a and Fri 10p-10a.
Cross Bronx:
Construction on both directions between Undercliff Avenue & Amsterdam Avenue (New York) , thru Friday July 25th, 2014, midnight-5am. Up to 3 lanes closed.
Construction on both directions between Undercliff Avenue & Amsterdam Avenue (New York) , thru Friday July 25th, 2014, midnight-5am. Up to 3 lanes closed.
Construction on I-95 both directions between 3rd Avenue; Exit 3 (New York) and Exit 2A - Jerome Avenue (New York) ,thru Saturday July 26th, 2014, 12:01 AM thru 05:00 AM, 2 lanes closed
Bronx River Parkway:
Construction on Bronx River Parkway northbound between East Fordham Road & East Gun Hill Road, thru Friday July 25thTuesday/ Wednesday/ Thursd ay/ Friday, 01:00 AM thru 06:30 AM, 2 lanes closed.
Construction on Bronx River Parkway northbound between East Fordham Road & East Gun Hill Road, thru Friday July 25thTuesday/ Wednesday/ Thursd
Construction on Bronx River Parkway southbound between East 233rd Street and Story Avenue, thru Saturday July 26th, 2014 Tuesday/ Wednesday/ Thurs day/ Friday/ Saturday, midnight-6:00 AM, 2 lanes closed.
Bridge replacement closes the SB Bronx River Parkway exit 12 - Crane Road (Yonkers) , thru Saturday July 26th, 2014 11:59 PM.
Grand Central:
Construction on Grand Central Parkway eastbound between Francis Lewis Boulevard & the Cross Island Parkway (New York) , thru Friday July 25th, 2014, Monday thru Friday, 01:00 AM thru 05:00 AM, 2 lanes closed
Palisades:
Sip Avenue (Jersey City):
Watermain break on Sip Avenue in both directions between US 1/9 Truck Route and Freeman Avenue in Jersey City. All lanes remain closed and detoured until 11:59 P.M. on September 30. 2014.
DETROIT
I-96:
The first closure will occur on westbound I-69 Business Loop (BL) to westbound I-94 from 7 p.m. to 6 a.m. nightly from Tuesday, July 22, through Thursday, July 24.
The second closure will occur on eastbound and westbound I-94/I-69 and on westbound I-69 BL to westbound I-94 from 8 p.m. to 6 a.m. nightly on Friday, July 25, and Saturday, July 26.
Westbound I-94 traffic will be detoured via westbound I-69, Wadhams Road, and eastbound I-69.
Eastbound I-94 traffic will be diverted to I-94 BL (Gratiot Avenue), which leads through Marysville and into Port Huron and the Blue Water Bridge.
Construction
continues eastbound and westbound I-96. The service drives have only
the right lane open between Telegraph and Newburgh roads until October.
I-94
and I-69 will need to be closed at times during the last two weeks of
July and throughout August in order to put steel bridge beams into
place. Motorists should expect overnight closures.
Portable message signs will be in place to alert you well in advance of these closures.The first closure will occur on westbound I-69 Business Loop (BL) to westbound I-94 from 7 p.m. to 6 a.m. nightly from Tuesday, July 22, through Thursday, July 24.
The second closure will occur on eastbound and westbound I-94/I-69 and on westbound I-69 BL to westbound I-94 from 8 p.m. to 6 a.m. nightly on Friday, July 25, and Saturday, July 26.
Westbound I-94 traffic will be detoured via westbound I-69, Wadhams Road, and eastbound I-69.
Eastbound I-94 traffic will be diverted to I-94 BL (Gratiot Avenue), which leads through Marysville and into Port Huron and the Blue Water Bridge.
CHICAGO
SAN FRANCISCO
80 EB on SFOBB from Tower 6 to SAS lanes 1 and 2 will be closed (Alternating) from 10PM till 5AM between 7/22 and 7/24 for electrical work
On the Jane Addams Memorial Tollway
Various
lanes on the EB ramps from I-190 to NB IL-53 will be closed including
IPO lanes for the ongoing widening and rebuilding project.
Closures will occur between the hours of 12 am and 11:59 pm of each day. This segment of the project will reach completion August 8th this year.
On the Eisenhower
All WB shoulders and lanes to Morgan Street will be closed between the hours of 7 am and 11:59 pm until July 31st for long term construction. Detour signs are posted in the work area to help motorists around the work zone.
On the Kennedy
Motorists can expect partial lane closures on the eastbound exit to SB Cumberland Ave from 7 am to 11:59 pm each day as part of an ongoing widening project that is scheduled to finish August 29th of this year.
SAN FRANCISCO
85 NB Connector to 101 (Mountain view) Full closure on every night from 9:01PM on 7/22 to 4AM on 7/26 for Highway construction
280 SB Full closure of the Connector to 87 SB on every night from 11PM 7/22 to 6AM on 7/28 for K Rail Installation
101 SB will have lane 3 closed between Grove St and Van Ness Ave from 9PM till 6AM from 7/23 till 7/25 for Sewer Work
101 NB Lane 1 will be closed for Paving from 11PM till 5AM from 07/22 till 7/25 and from 11PM till 8AM from 7/25 till 7/26
LOS ANGELES
In Long Beach, the Ocean Blvd off ramp is closed on the 710 SB for repair on the Desmond Bridge.
In Burbank, the Burbank Blvd on ramp is closed to the 5 on the NB side for on going Caltrans work.
In Arleta, the Branford St. on ramp is closed to the 5 on the SB side due to construction.
In Pasadena, Pasadena Ave is closed in both directions between Columbia St and California Ave for the repaving project.
No comments:
Post a Comment