Tuesday, August 26, 2014

GeoTraffic Roadwork Roundup - Philadelphia!


GeoTraffic Roadwork Roundup - Philadelphia!
August 25th - August 31st


Gradual street closures along the Ben Franklin Parkway start the week of the 25th and will spread outward until the weekend of the festival, Saturday, August 31st through Tuesday September 3rd .
Closure points will run from the Parkway and 20th north to 20th and Spring Garden, west across 76 to 31st Street, MLK Drive from Montgomery to the Art Museum, Kelly Drive from Fairmount to Eakins Oval, and 22nd, 23rd, 24th, and 25th Streets between Fairmount and Spring Gardent.
If you are traveling to Philadelphia for Made In America, your best bet is to use public transportation to get to the Benjamin Franklin Parkway. NJ Transit will be operating under the normal weekend schedule and SEPTA will be adding service to the Broad Street and Market-Frankford subway lines during the two-day festival. Late-night service will also be extended on select Regional Rail lines.
Rumble strip installation on Woodhaven Road between RT-1/Roosevelt Boulevard and the Bristol Pike, PA-13 weekdays from 9 AM to 3 PM.
Overnight bridge joint repair on I-95 southbound with lane closures between Kerlin Street and Highland Ave from 9 PM to 5 AM

Milling and paving operations with lane closures on I-95 northbound ans southbound between Bartram Ave and the Girard Point Bridge overnights from 9 PM to 5 AM.

Drain cleaning and debris removal on I-676 eastbound and westbound weekdays from 9:30 AM to 2 PM.


Drain cleaning and debris removal on I-76 eastbound and westbound between RT-1/City Ave and 26th Street 9:30 AM to 2 PM weekdays. 

GeoTraffic Roadwork Roundup - New York City!


August 25th - August 31st


Overnight detours for Manhattan-bound traffic on the Brooklyn Bridge Monday - Thursday nights: 11 PM to 6 AM.

In the Bronx expect lane closures on I-95 the Cross Bronx Expressway between Amsterdam Ave and Webster Ave from 11 PM to 5:30 AM weeknights, 12 AM to 5:30 AM Saturday and 12 AM to 5:30 AM Sunday 

Lane closures northbound and southbound on I-87/The Deegan Expressway Monday through Saturday 10 AM to 3 PM daily and 10 PM to 5 AM nightly. 

In Brooklyn one of three lanes will be closed on the outbound/southbound Gowanus Expressway from the Belt Parkway to 3rd Ave. 

In Queens one lane of Grand Central Parkway will be closed eastbound and westbound between 82nd Street and 111th Street from 10 AM to 2 PM and again from 10 PM to 5 AM weekdays and again 10 PM Friday through 7 AM Saturday for landscaping. 

Look for single lane closures on the Staten Island Expressway eastbound and westbound between 9 AM and 3 PM weekdays and again 10 PM to 5 AM weeknights for road repair. 

The I-80 Express Ramp to the New Jersey Turnpike Southbound roadway is closed for bridge work. All Traffic to the Turnpike Southbound roadway must use I-80 Local. This new traffic pattern will remain in effect until this November.

Nightly roadwork has begun on the Palisades Interstate Parkway and will continue until December. Please consider using Mass Transit or an Alternative Route. 

GeoTraffic Roadwork Roundup - Los Angeles!


GeoTraffic Roadwork Roundup - Los Angeles!
August 25th - August 31


Bridge work on the 605 southbound from RT-210 to Arrow Highway on Monday the 25th from 9:30 AM to 2 PM.
Overnight pavement work on CA-39 northbound and southbound at RT-10 the San Bernadino Freeway closing multiple lanes. 

Bridge work causing a complete closure of the on the ramp from southbound Branford Street to the 5 southbound.
Demolition work on the connector bridge from the 710 southbound to Ocean Boulevard southbound.
Long term bridgework on the 110 northbound at C street.

Longterm work continues on the ramp from the 710 southbound connector to Ocean Boulevard southbound.
Made in America will close streets from Aug. 23 to Sept. 4.
N. Main from Temple to 1st Street
N. Spring from Temple to 1st Street
N. Hill from Temple to 1st Street
N. Grand Avenue from Temple to 1st Street
N. Broadway from Temple to 1st Street
S. Spring from 1st to 2nd Street
1st from Main to Olive Street
Hill from 1st to 2nd Street
Broadway from 1st to 2nd Street
Main from 1st to 2nd Street
As part of advanced relocation of utilities to pave the way for the construction of station boxes and tunnels to begin on the Regional Connector Project, 2nd Street between Spring Street and Broadway will remain closed for a 4- week period beginning Saturday, August 23.

The closure is necessary so utility crews can install electrical vaults on 2nd Street to support the construction of the 2nd Street/Broadway Station for the Regional Connector. Because the vaults are the width of the street, a 4-week full closure is needed for this work. The closure will be in effect 24-hours a day.

Anticipated hours of construction work are 7 a.m. to 9 p.m. Monday – Friday, 8 a.m. to 8 p.m. on Saturdays and 9 a.m. to 9 p.m. on Sundays. Barriers will be placed to separate the work area from traffic and during the closure, saw-cutting, excavation, conduit and vault installation work will be performed.

Civic Center/Grand Park Station will be closed during Made in America. Trains will not stop at the station

GeoTraffic Roadwork Roundup - Detroit!


GeoTraffic Roadwork Roundup - Detroit!
August 25th - August 31st

I-75 in Wayne County, overnight road repair northbound and southbound between Sibley Road and Goddard Road with lane restrictions.

Road resurfacing on West Jefferson Ave in the city between Griswold Street and St. Antoine Street with one lane opened in each direction.

Roadwork on Woodward Ave between Chandler Street and Adams Street with lane closures in each direction including the center left-turn lane.

Long term closure on I-96 eastbound and westbound continues between Telegraph Road and Newburgh Road with detours in effect through November.

Guardrail installation on I-94 eastbound and westbound between Hannan Road and I-275 including shoulder closures during off-peak times. 

GeoTraffic Roadwork Roundup - Boston!


August 25th - August 31st

Overnight closure on the ramp from Leverett Circle to I-93/The Expressway southbound SB Monday through Thursday, August 28th from 11 PM to 5 AM. 

Double right lane closure from lower deck of I-93/The Expressway, through the O'Neil Tunnel, closing exits 20 B from Monday, August 25th through Wednesday, August 27th from 11 PM to 5 AM.

Double left lane closure on I-93/The Expressway northbound approaching the entry of the O'Neil Tunnel to the Zakim Bridge from Wednesday, August 27th from the hours of 11:30 PM to 5 AM. 

Left lane closure of I-90/The Mass Pike eastbound at Commonwealth Ave under Bowker Overpass on Thursday, August 28th from 7 AM to 3:30 PM.

Right lane closure in the Callahan Tunnel on Thursday, August 28th from 11 PM to 5 AM.

GeoTraffic Roadwork Roundup - Atlanta!


August 25th - August 31st

Spring Street Detour Beginning September 2, 2014. Work crews will begin work on reconstruction of the Spring Street Viaduct in downtown Atlanta. Beginning September 2, 2014, (weather permitting) all traffic on Spring will be detoured to avoid the construction area. This detour will be in place through Fall 2015.  

Rolling closures overnight from 9 PM to 5 AM overnights on the outer Perimeter at Washington Road. 
Construction on the inner Perimeter taking out two lanes from 5 AM to 8:35 AM overnight at GA-400.

Tuesday, August 19, 2014

GeoTraffic Roadwork Roundup - Philadelphia!


GeoTraffic Roadwork Roundup - Philadelphia!
August 18th - August 24th


On The Schuylkill Expressway in both directions, paving will result in lane restrictions between Passyunk and Grays Ferry, nightly this week from 9pm - 5am.  

Also on 76, drain cleaning and debris removal will take place in both directions this week. We will see lane restrictions between City Avenue and 26th Street from 9:30am - 2pm.

On Rt 1, The Roosevelt Boulevard, NB, milling and paving will shut down the inner drive between 9th St and Winchester St, each night from 7pm - 5am.

I-95 will have lane restrictions for milling and paving work between Bartram Avenue and the Girard Point Bridge, every night this week from 9pm - 5am.

On Rt 202 NB, patching will take place on the ramp to 76 EB, partially blocking the ramp all week long from 8am - 5pm.


On Rt 611 (Broad St) foundation excavation and light installation is happening this week, with lane closures between Spring Garden St and Glenwood Ave, daily from 7am - 3:30pm.

GeoTraffic Roadwork Roundup - Atlanta!


GeoTraffic Roadwork Roundup - Atlanta!
August 18th - August 24th


ATLANTA

In Fulton County, construction on Riverside Dr will block between N. Harbor Dr and Johnson Ferry Rd.

In Atlanta, Streetcar Project Expect closures along Auburn Ave. near Peachtree St. and on surrounding roads.

In Fulton County, Line Creek Bridge Replacement. Bohannon Rd is blocked between Mann Rd and Creekwood Rd until July 2015.

In Atlanta, road closed indefinitely - Martin Luther King Jr. Dr. between Northside Dr. and Centennial Olympic Park Dr. to begin new stadium construction. Mitchell and Tatnall Streets are alternates.

In Cherokee County, portions of Hickory Road, Holly Street, and Palm Street will be repaired and resurfaced. Expect delays. 

Road Closures for Filming: In Atlanta: Lane Closure Pryor St. between Alabama St. and M.L. King Jr. Dr. 7:00 a.m. to 10:00 a.m. daily through 8/26.

GeoTraffic Roadwork Roundup - Washington DC!


GeoTraffic Roadwork Roundup - Washington DC!
August 18th - August 24th


Washington, D.C.

In Baltimore City, E. 26th street is closed for emergency road construction Both EB/WB between North Charles Street and Saint Paul Street all this week from midnight to 5 am 

The right lane closed on George Washington Pkwy NB between Vernon View Dr and Waynewood Blvd from Monday to Friday 10 P.M. to 5 A.M.

Inside the District, 2nd St off-ramp closed SB after Washington Ave this week for re-construction from 10 P.M. to 5 A.M.

Long-term road construction on Benning Rd between Hwy 295 and Oklahoma Ave expect delays .